This paper analyzes the effective determination and control of project cost,
which mainly lies in the early management, that is, the key lies in the investment
decision and design stage before construction. At the same time, it is necessary to set
up the concept of whole-process management of project cost, and control it in advance
and in the process rather than afterwards, so as to get twice the result with half the
effort.