if sewage pipeline is encountered in the open excavation project of subway constructed in the city, it needs to be relocated before construction. This paper introduces the key points in the construction of large-diameter sewage diversion, and through the key control of these points, to achieve the expected diversion effect, so as to ensure the smooth progress of the subsequent excavation construction.