International Open Access Journal Platform

logo
open
cover
Current Views: 58321
Current Downloads: 83142

Advance in Civil Engineering

ISSN Print:2707-3262
ISSN Online:2707-3270
Contact Editorial Office
Join Us
DATABASE
SUBSCRIBE
Journal index
Journal
Your email address

复杂地质条件下核电厂初步设计阶段岩土工程勘测探析

Geotechnical engineering investigation and analysis in the preliminary design stage of nuclear power plant under complex geological conditions

Advance in Civil Engineering / 2019,1(1): 1-6 / 2019-12-12 look927 look1079
  • Authors: 何中超*      郑骁     
  • Information:
    福建信息职业技术学院,福州
  • Keywords: 核电厂;岩土工程;勘察
  • Nuclear power plant; Geotechnical engineering; Investigate
  • Abstract: 针对某核电厂初步设计阶段岩土工程勘测中存在的问题,结合我国现行的有关核电厂勘测技术规范,初步探讨和研究复杂地质条件下解决有关问题的途径。
  • In view of the problems existing in the geotechnical investigation during the preliminary design stage of a nuclear power plant, combined with the current technical specifications for the investigation of nuclear power plants in China, the approaches to solve the problems under complex geological conditions are discussed and studied.
  • DOI: https://doi.org/10.35534/ace.0101001c​
  • Cite:

    何中超,郑骁.复杂地质条件下核电厂初步设计阶段岩土工程勘测探析[J].土木工程进展,2019,1(1):1-6.

    https://doi.org/10.35534/ace.0101001c

Already have an account?
+86 027-59302486